|
DESIGN OF TRUNNION-HUB GIRDER ASSEMBLIES FOR BASCULE BRIDGES Committed to bringing numerical methods to undergraduates |
|
|
|
|
||
|
Home | Grant 1: (98-01) | Grant 2: (01-03) | Grant 3: (04-05) | Pictures | Links |
||
Assembly Procedure 1 (AP1) of Full Scale Testing |
|
Trunnion, Hub and Girder |
|
Trunnion fitted into Hub |
|
Trunnion-Hub fitted into Girder |
|
Completed THG assembly |
|
Hub heated to 200F via heat blankets
|
|
Hub being aligned for trunnion drop |
|
Measuring the diameter of the cooled trunnion |
|
Inserting the cooled trunnion in heated hub |
|
Trunnion getting in contact with the hub |
|
Ice formation on the trunnion-hub assembly |
| Mechanical Engineering| University of South Florida | FDOT | Contact us |
![]() |